Keegan & Associates provides Project Management and Project Engineering for our customers.  We specialize in projects involving radioactive and hazardous materials, specialty chemical process design, engineer, build, and SuperLoad DOT project planning and compliance.

Recent projects:

Pretreatment Engineering Platform (PEP)
K&A was engaged to manage this $32 million project for the Washington Group, contracted through Bechtel National for the Department of Energy.  A series of chemical processing skids were required by the DOE to validate portions of a waste treatment plant being built in Richland, WA.  The skids were designed to use a mixture of chemicals that were not radioactive, but that would simulate the chemical properties of the waste that would be processed by the Department of Energy. The project was at the conceptual stage when K&A was engaged, and 14 months later, the system was designed, engineered, fabricated, tested and delivered.  The final product had more than 20 ASME code-stamped pressure vessels and heat exchangers, several miles of small bore stainless steel piping, and over 1,500 instruments.

Pulse Jet Mixer Test Platform
K&A was engaged to assist with project management with this $6 million follow-on project to the PEP for the Tessenderlo Kerley Services, contracted through Energy Solutions and Bechtel National for the Department of Energy.  A series of process skids were required to test the Pulse Jet Mixers being planned for use in a waste treatment plant being built in Richland, WA. As with the PEP, the project was at a conceptual stage when we were engaged, and about 7 months later the system was designed, engineered, fabricated, tested, and delivered.

Pharmaceutical decommissioning.
K&A was engaged to provide Project Management to decommission approximately 800,000 square feet of research laboratory area for a major (confidential) pharmaceutical firm.  The project included negotiating clean-up criteria and release criteria with the government regulating agency, assembling a field team of technicians, draftsmen, and laborers to complete the decommissioning.  The final report was submitted to the customer and the regulating agency approximately one week after field work was completed, and approval received from that agency on the initial submittal.

DOT Planning.
K&A was engaged by Big Sky Specialized to develop shipping and tie-down planning for several SuperLoads being planned for shipment from various CONUS locations to the DOE facility in Richland, Washington.  To date we have planned and completed shipments of a 100,000 pound Diesel Generator, and several oversize silos. 

If you are a client, click here for documentation on how to download your client files.

Home | Download Instructions

Copyright ©2008 Keegan & Associates
Keegan & Associates • 1706 N. Mesa • Carlsbad, NM 88220
865.414.5264 • lfkeegan@keeganandassociates.us